Building out Seabrook Unit 2 is just about the only remotely feasible option.
Pilgrim and Vermont Yankee are mostly disassembled. Pilgrim also had issues with the water temperature in Cape Cod bay affecting power levels.
At the root though, the Feds need to get off their butts and tell (not...