Search results

  1. G

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Looks like the appendage parcel of V or R (?) is under construction
  2. G

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    not my photos Site Progress August 2023 August Aerials 2023
  3. G

    Assembly Square Infill and Small Developments | Somerville

    @Javier, @Arenacale , I believe your photos belong here: Assembly Innovation Park there is no active construction work in assembly row
  4. G

    Assembly Square Infill and Small Developments | Somerville

    there's no work happening in Assembly Row proper, correct? (Parcels 7A, 7B, and 9 have yet to start)
  5. G

    Bulfinch Crossing | Congress Street Garage | West End

    i wish they would've built the residential tower II prior to moving to the life sciences building across the street...button up that mega block first, take more time to get the adjacent block *right* before starting
  6. G

    88 Seaport Blvd | Seaport Square Parcel D | Seaport

    great point, that streak is at risk now and i don't think this one starting immediately would be enough to save it. i think we need one of these 2 projects to start to keep the streak alive (as foundation work is already done): - Fan Pier Parcel H - Seaport Square Block N
  7. G

    Lyra (née The Huntington) | 252/258/264 Huntington Avenue | Fenway

    good to have your photos back, beeline! i always appreciated your coverage of the lesser known/photographed projects
  8. G

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    July Aerials 2023 Site Progress July 2023 not my photos. no indication of any new parcels starting
  9. G

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Site Progress June 2023 not my photos. note the construction offices moved from Parcel LM to Parcel D
  10. G

    North Station, Charles River Draw, & Tower A

    South Bank Bridge Project | West End
  11. G

    Bill Russell Bridge | North Washington St.

    North Washington Street Bridge Construction Look-Ahead Through June 24 Scheduled Work • Installation of concrete deck placements • Installation of bridge deck formwork • Installation of bridge barrier and sidewalk formwork • Cutover of utilities to permanent bridge
  12. G

    Seaport Neighborhood - Infill and Discussion

    it's an air rights parcel (D1) and to your point, hopefully something is proposed soon...the only remaining Massport parcels to develop are H (already proposed), Housing on D Street (part of core block, already proposed), and parcels D1 and D3 (neither proposed)
  13. G

    🔹 What's Happening With Project X?

    are there any currently active OxBlue cameras on city projects?
  14. G

    88 Black Falcon Avenue | Seaport

    An update to a previously approved project at 88 Black Falcon Avenue to split construction and renovations of the project into two phases.
  15. G

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    my guess in order of likelihood: Parcel R, Parcel Q2, Parcel V
  16. G

    Bill Russell Bridge | North Washington St.

    Construction Update: North Washington Street Bridge Construction Look-Ahead Through May 13 Scheduled Work • Installation of concrete deck placements • Installation of bridge deck formwork • Installation of electrical utility conduits on bridge structure • Installation of gas and water...
  17. G

    🔹 What's Happening With Project X?

    statuses? East Boston Piers Park Phase 2, Piers Park Phase 3, and Portside Pier Charlestown Pier 5 Seaport Dry Dock 2
  18. G

    🔹 What's Happening With Project X?

    any indication on what is happening here in the West End? / is there a thread?
  19. G

    Bill Russell Bridge | North Washington St.

    North Washington Street Bridge Construction Look-Ahead Through April 29 Scheduled Work • Installation of concrete deck placements • Installation of bridge deck formwork • Installation of sidewalk steel and formwork • Installation of electrical utility conduits on bridge structure •...

Back
Top