Search results

  1. cubbe8

    MBTA Buses & Infrastructure

    Route 9 EB is not wide enough for 3 lanes between High and the bus stop without serious reconstruction. This was one of the alternatives proposed when the plans were being developed but was shelved because it would require reconstruction of the entire sidewalk and bike lane area between High and...
  2. cubbe8

    Biking in Boston

    Yesterday’s meeting for Chestnut Hill Ave...
  3. cubbe8

    MBTA Buses & Infrastructure

    For this to work Kent between Washington and Station would need to be made 2 way. The idea is a good one.
  4. cubbe8

    MBTA Buses & Infrastructure

    Based on my observation compliance was fairly good. I think the many intersections and uncoordinated signals negates the time savings.
  5. cubbe8

    Bowker Overpass replacement?

    10/15 Median has been removed on Boylston Street east of the overpass and the Boylston Street has been milled west of the overpass. Temporary signals on wooden poles have been installed at the intersection. Bridge abutments are being formed.
  6. cubbe8

    MBTA Buses & Infrastructure

    The Brookline Select Board really wants the bus lanes on Washington Street removed ASAP. They say it can’t wait until the spring when the pilot is supposed to end which will provide alternate proposals for bus priority. They say that MassDOT repaving crew that is currently resurfacing Boylston...
  7. cubbe8

    Biking in Boston

    There is also a hybrid meeting tonight at 6:30 https://www.brooklinema.gov/3922/Beacon-St-Bridle-Path-Design-Review-Comm
  8. cubbe8

    I-90 Interchange Improvement Project & West Station | Allston

    https://www.mass.gov/doc/allston-multimodal-task-force-meeting-presentation-91825/download
  9. cubbe8

    Biking in Boston

    What on earth are these things. They won’t do anything as a car can drive over them so easily
  10. cubbe8

    MBTA Construction Projects

    The screenshot from July you referenced had all those projects under the future category, with the estimated opening date as TBD. It appears the future category has been omitted from the website as there is no definite timeline for those projects. I would not say they are cancelled.
  11. cubbe8

    Lyrik Back Bay | 1001 Boylston Street (Parcel 12) | Back Bay

    Is there any reason they can’t open the Boylston Street entrance? It’s not like the situation at Arlington where it’s the problem that that entrance is not accessible since the whole station is not accessible at Hynes.
  12. cubbe8

    Lyrik Back Bay | 1001 Boylston Street (Parcel 12) | Back Bay

    It can’t open until Hynes is made accessible. It triggers ADA upgrades.
  13. cubbe8

    MBTA Buses & Infrastructure

    https://mass.streetsblog.org/2025/09/17/usdot-cancels-20-million-pledge-to-fund-street-and-transit-improvements-in-roxbury
  14. cubbe8

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Tree removal for C branch project has been approved by select board after NIMBYs went crazy and appealed the tree committee decision for loosing one tree that had to be removed due to type 10 bogies being wider than the existing cars.
  15. cubbe8

    Memorial Drive Greenway Phase III

    Ideally Rte 2 should be routed over the Eliot bridge and Storrow and Exit numbers added on storrow and SFR
  16. cubbe8

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    https://brooklinema.portal.civicclerk.com/event/14290/files/attachment/8152 New renders for C branch. If approved on sept 30 it goes for construction next month.
  17. cubbe8

    2025 Boston Mayoral Race

    Or governor..
  18. cubbe8

    975 Boylston | Mass DOT Parcel 13 | Boylston & Mass Ave | Back Bay

    Please please please fill that hole

Back
Top