Search results

  1. J

    50 Herald Street | Chinatown / South End

    I believe there is supposed to be ground floor grocery retail space in the new building planned. Hopefully something similar comes back in the new building. There really wasn't any reason to try to salvage the current building -- it's a bit of a mess.
  2. J

    New Red and Orange Line Cars

    I think the last shutdown completed the trackside installation work. But I suspect (since the T is claiming work is not done) there is still back-office, Command Center, and testing work in process.
  3. J

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I acknowledge all your points about Phase 3 being a mess -- horrible concept as BRT. But I still insist that the bigger point is that the Big BRT Hype was actually a BRT Lie, because the service being built never qualified as BRT. The service serving the former elevated Orange Line (SL4/5) has...
  4. J

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I think BRT Lie is a better characterization, because the SL4/SL5 service has never passed muster as BRT. Real BRT has a dedicated right-of way that cannot be infringed on by traffic. The best BRT systems have level, all-door boarding; protected, fare control stations; signal priority at all...
  5. J

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    There actually are directional arrows on the SL loops (at the end of each loop at the break point), but they are way too subtle for the average user of the map to identify their purpose. Very poor graphical design. There needs to be much clearer designation of the one-way nature of the loop...
  6. J

    New Red and Orange Line Cars

    Orange Line signal upgrades are still in progress. Completion is scheduled for end of 2026. We are almost there, but not quite. https://www.mbta.com/projects/orange-line-program#signals
  7. J

    Gillette/P&G Redevelopment | South Boston

    Remaining manufacturing is moving to Andover. But the announcement said R&D functions stay in South Boston. R&D for Gillette products still means robotic manufacturing development, metallurgy and specialty coating labs, as well as more general chem labs.
  8. J

    Gillette/P&G Redevelopment | South Boston

    Gillette's lab space needs are pretty bespoke -- it is not generic bio lab space. They are not a biotech, they are very high volume precision consumer products player. They are going to get much more of what they need building their own building to spec than trying to do a build out on a lease.
  9. J

    Gillette HQ and Technical Innovation Center | 232 A Street | Fort Point

    I think the "freebies" are already baked into the development approval P&G is buying back with the site (waterfront park, for example).
  10. J

    Biking in Boston

    I hope there is a real commitment to maintaining the warning paint striping along these barriers. The cast-in-place barriers are very hard for both cyclists and drivers to see in low visibility situations. Great way to really screw up a tire and rim (cycle or car). We are not exactly known...
  11. J

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    If you look at the proposed service patterns, some trains change from N-S to E-W at Springfield. It is not pure N-S, E-W service. Inland route New Haven to Boston, for example. Not saying you get to six trains, but there are complications. Plus freight.
  12. J

    Revere Infill and Small Developments

    Just call it Wonderland High School -- much cheaper than changing ever T map and sign. (Hint, you don't change the name of the terminus station of a line -- whose name appears on every wayfinding sign on the line, and map throughout the system -- without a damn good reason. Something like...
  13. J

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    Convergence of N-S and E-W service, as well as inland route NH to BOS -- sufficient platforms for layovers and timed transfers?
  14. J

    The New Retail Thread

    Price gouging. Overpriced tickets for entry and overpriced food and drinks.
  15. J

    Dorchester Infill and Small Developments

    But it fits in with all the multi-generational mish-mash updates to the three-deckers in Dot.
  16. J

    Lyra (née The Huntington) | 252/258/264 Huntington Avenue | Fenway

    Looks like they are trying to claim the Millennium Tower Mech Screen Fail Award.
  17. J

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    Two words: Diesel Locomotives.
  18. J

    High Spine

    Sounds like you are advocating for Columbus Center being revived. (Although a corner of the terra firma needed for the tower was purposefully turned into Frieda Garcia Park, corner of Stanhope and Clarendon, to prevent that tower from ever being proposed again.)
  19. J

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    Fare gates are used for scan out too, to validate inbound fare. Not just for scan in.
  20. J

    The New Retail Thread

    If only there were a plan to convert that corner of the mall into something we really need, like housing. 🙃

Back
Top