  1. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    I look at this entire project as the entire state of Massachusetts and the Federal government being told to go suck on half a billion dollars in debt so that BU can be left untouched. Or alternatively we are paying an extra half billion to preserve a single lane of traffic for a few hundred...
  2. tangent

    MBTA Buses & Infrastructure

    I believe the early design was basically to just eliminate the right lane on the Northbound side and put in bike lanes.
  3. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    The better way to do this is not to do this. Just reduce speeds and go down to two lanes on the Pike in both directions for however long it takes to demolish the existing raised structure. Shift the four lanes to the ground, then demo the other side. Grade and pave. Done. The aggregate of...
  4. tangent

    MBTA Buses & Infrastructure

    Interesting.
  5. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    I think the endless moving highways around because they won't shut it down for a few months to do the demo is maddening. If they add together all the road closures and lane reductions over that decade it would likely be less disruptive to just shut down all those roads, blow it all up, haul it...
  6. tangent

    Encore Boston Harbor Casino | 1 Broadway | Everett

    I would so very much like to see a theme park or some conglomeration of entertainment and other facilities clustered in that area. Maybe a rollercoaster, ferris wheel, and lively waterfront outdoor marketplace.
  7. tangent

    Encore Boston Harbor Casino | 1 Broadway | Everett

    Yes, things that you can't just slap a new sign on to repurpose. Which is both good and bad. For better and worse there was no pre-existing architecture in that area to blend with... except bleak industrial or standard strip mall. Not that they would have tried, but now the burden is on...
  8. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    They would if the bank was moved back an equal amount on the Cambridge side. I agree it probably would never happen, but I also don't think this project should happen unless they ground the major road ways either by filling in the river, eliminating lanes or eliminating pedestrian...
  9. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    The state was filling in the harbor as late as the 1980s... it's not unimaginable.
  10. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    Exactly. Add 20' to the bank of the Charles. Or eliminate the pedestrian/bike infrastructure on that side of the Charles until transit capacity or demand drop proves a lane reduction/shift away from the Charles is possible. Spending an extra billion and making the project take another...
  11. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    Would save a few hundred million.
  12. tangent

    I-90 Interchange Improvement Project & West Station | Allston

    Might be a good time to just knock it all down and build the road on the ground. Get it done while people aren't on the roads. Half joking, just half.
  13. tangent

    Pinnacle at Central Wharf (Harbor Garage) | 70 East India Row | Waterfront | Downtown

    It's ugly and will reduce the viability of the aquarium in Boston. Despite what people might hope for the future of mass transit and autonomous cars... it isn't here yet and lack of proximity of parking is going to negatively impact membership and visits to the aquarium for everyone outside...
  14. tangent

    Leggat McCall | BHA Bunker Hill | Charlestown

    Well they are adding a 1000 units of housing over existing density with some mixed use. Seems like a good project after reading through the material.
  15. tangent

    BCEC expansion | Seaport

    Hynes has a lot of upper level spaces.
  16. tangent

    BCEC expansion | Seaport

    Maybe this is a bridge too far, but just put the post office underneath the convention center expansion. You build a big space on the first floor with the convention hall floor 30 or 40 feet above ground level. Line it with ground level streetscape spaces along the city streets. Innovation...
  17. tangent

    BCEC expansion | Seaport

    The area in back of BCEC has direct access to the South Boston Bypass rd which makes it a very good choice for the post office. A mail sorting facility doesn't need a waterfront location. I understand there are some benefits to having one giant contiguous convention center. And I think those...
  18. tangent

    BCEC expansion | Seaport

    BCEC should do a land swap with 525 E Street. Another waterfront post office to replace a slightly more valuable waterfront post office is not what the area needs. But a waterfront convention center adjacent to where the cruise ships come in with a vibrant mixed use development. Just stick...
  19. tangent

    BCEC expansion | Seaport

    I think I agree with a lot of the above. Public subsidized convention centers make about as much sense as public subsidies for sports stadiums... meaning they don't make sense economically. At best they break even sometimes and can bring in a little money from outside the region, or at least...