RandomWalk
Senior Member
- Joined
- Feb 2, 2014
- Messages
- 3,030
- Reaction score
- 4,270
I’m convinced that Jimmy Hoffa is buried under the slab at Circuit City...
18 floors, 596,000SF, so presumably something like 300'.
Every core shell lab building is a lab/office building. It's all a matter of the split.Parsing that letter very tightly, it seems they dropped the office component of the original “Lab/R+D/Office” building. And the Somerville planning director is saying it’s not such a big deal change, no prob. My best guess.
Every core shell lab building is a lab/office building. It's all a matter of the split.
Typically these days it's back to 60/40 from a brief time when it was 50/50.
With the difficulty of getting people back into the office, they may start venturing closer to 70/30.
The office component is still very much a part of these buildings.