The April Board slide deck is out, and oh boy, there's things in it. Taking it from the top,
- the new Terminal E is already getting a graft-on addition in the form of a low box in front for a "South-West Bag Building." Notably, occupies space seen in previous months that showed a MBTA station walkway/connector.
- Original Terminal E is getting new vertical circulation, 2 additional bag claims, and significant roadway expansion.
- All of the expanded curb area will be covered by a continuous canopy spanning from the new Terminal E Garage to the Original Terminal E. This potentially replaces the previously seen BIL funded canopy project from September(?).
View attachment 52298
View attachment 52293
View attachment 52294
View attachment 52292
View attachment 52295
View attachment 52296
View attachment 52297