ccole
Active Member
- Joined
- Apr 4, 2016
- Messages
- 172
- Reaction score
- 1,357
Attended the second public meeting for this project last night. The scope is fairly substantial - 2 miles of the Memorial Drive Greenway from the BU Boathouse to the Eliot Bridge. The project scope includes reworking the BU Bridge Rotary/Reid Overpass intersection (three very early alternatives at the end of the slideshow). The DCR seems very intent on decreasing traffic speeds and vastly improving the public realm for pedestrians and cyclists.
Slideshow: https://www.mass.gov/files/documents/2019/06/26/MDG PhaseIII Public Meeting-presentation.pdf
Slideshow: https://www.mass.gov/files/documents/2019/06/26/MDG PhaseIII Public Meeting-presentation.pdf
Last edited: