Old Colony phase 4, 5, & 6 | 72-110 Mercer street | South Boston

stick n move

Superstar
Joined
Oct 14, 2009
Messages
11,191
Reaction score
15,367
Cant believe there wasnt a thread for this.


Old Colony (Phase 4 and 5)​


1705876630482.jpeg


“The Final Phase will include the demolition of 208 existing units and the construction of 342 new apartments that will be undertaken in three phases (Phase 4, Phase 5 and Phase 6). This will accomplish the goal in Phase 4 and Phase 5 with a one-to-one replacement of 208 apartments, plus in Phase 6 to be approved separately from the 121A projects at a later date, a new production of 134 additional affordable apartments and affordable condominiums.

Buildings will have townhouse-style direct entry apartments on the first floor to the extent possible due to flood plain and climate resiliency design considerations. The buildings will be designed similar to previous phases using modern materials that will better integrate the buildings into the surrounding neighborhoods and eliminate the industrial feeling associated with public housing developments of the mid-1900s. Ground floor units will have individual front door entries. Small office for local service providers as well as a small ancillary maintenance space will be included in the buildings.

The Final Phase will complete the 10-year redevelopment of Old Colony – weaving the community back into the fabric of South Boston and creating new view corridors both to downtown Boston and the waterfront. The landscaped open spaces will also improve stormwater runoff conditions and allow for groundwater infiltration.”

https://www.bostonplans.org/projects/development-projects/old-colony-phase-4-and-5

1705876817571.jpeg

1705876831054.jpeg

1705876842666.jpeg

https://cranshaw.com/portfolio-page/old-colony-phases-4-5/

Pnf
https://bpda.app.box.com/s/ozcpnukkwy16juisqgx06pz45s59vnj4


BPDA approves final phase of the Old Colony housing redevelopment
1705877278159.jpeg

1705877295804.jpeg

1705877313088.jpeg

1705877328557.jpeg

1705877343419.jpeg

1705877356808.jpeg

“The Boston Planning & Development Agency has approved the sixth and final phase of the Boston Housing Authority’s redevelopment of the Old Colony housing project in South Boston.

Phase six includes the development of a five-story building which will be entirely income-restricted – including age-restricted senior housing. The 89 units will be a mix of one-, two-, three-, four- and five-bedroom units.

The project will include ground floor community space, which developers expect to be leased by a local South Boston arts organization working with low-income individuals, according to the filing.

It will also contribute to area improvements including new neighborhood pedestrian connections, and onsite bicycle storage.”

https://bostonagentmagazine.com/202...hase-of-the-old-colony-housing-redevelopment/


https://www.bostonplans.org/projects/development-projects/old-colony-phase-6
 
Last edited:

Old Colony Final Phase Update 01/15/24

old_colony_january.jpeg

Construction Update: Old Colony Redevelopment

“Framing is complete for phases 4 & 5 within the Old Colony redevelopment in South Boston. The project will create 208 units within two new buildings. The new buildings are slated for completion in the fall of 2024. The project is targeting LEED Gold certification and Passive House standards.”

Bldup link
 

Beacon Communities Closes on Financing for Old Colony Phase 6​

1717695123043.jpeg


“Beacon Communities has closed on financing for Old Colony Phase 6, the final step in the transformation of the Anne M. Lynch Homes at Old Colony into a vibrant, modern community for residents in South Boston. Old Colony Phase 6 will feature 89 apartments for families and seniors, with construction set to begin soon. The building will also include a community space to be home to SPOKE, a community-based arts organization.”

https://www.bldup.com/posts/beacon-communities-closes-on-financing-for-old-colony-phase-6
 
From last weekend.
 

Attachments

  • IMG_2806.JPG
    IMG_2806.JPG
    5 MB · Views: 94
  • IMG_2807.JPG
    IMG_2807.JPG
    5.4 MB · Views: 67
  • IMG_2808.JPG
    IMG_2808.JPG
    4 MB · Views: 60
  • IMG_2809.JPG
    IMG_2809.JPG
    5.6 MB · Views: 61
  • IMG_2810.JPG
    IMG_2810.JPG
    6.6 MB · Views: 81
  • IMG_2811.JPG
    IMG_2811.JPG
    6.8 MB · Views: 99
  • IMG_2813.JPG
    IMG_2813.JPG
    7.1 MB · Views: 74
  • IMG_2816.JPG
    IMG_2816.JPG
    5.8 MB · Views: 68
  • IMG_2819.JPG
    IMG_2819.JPG
    5.3 MB · Views: 67
  • IMG_2822.JPG
    IMG_2822.JPG
    5.2 MB · Views: 77
  • IMG_2823.JPG
    IMG_2823.JPG
    4.5 MB · Views: 67
From 8/4
 

Attachments

  • IMG_4685.JPG
    IMG_4685.JPG
    4.9 MB · Views: 56
  • IMG_4687.JPG
    IMG_4687.JPG
    6.2 MB · Views: 48
  • IMG_4688.JPG
    IMG_4688.JPG
    5 MB · Views: 52
  • IMG_4691.JPG
    IMG_4691.JPG
    6.3 MB · Views: 56
  • IMG_4692.JPG
    IMG_4692.JPG
    5.1 MB · Views: 58
  • IMG_4693.JPG
    IMG_4693.JPG
    4.8 MB · Views: 61
  • IMG_4694.JPG
    IMG_4694.JPG
    5.2 MB · Views: 54
  • IMG_4696.JPG
    IMG_4696.JPG
    5.5 MB · Views: 52
  • IMG_4697.JPG
    IMG_4697.JPG
    5.3 MB · Views: 49
  • IMG_4703.JPG
    IMG_4703.JPG
    5.1 MB · Views: 57
  • IMG_4706.JPG
    IMG_4706.JPG
    4.9 MB · Views: 60
  • IMG_4707.JPG
    IMG_4707.JPG
    4.1 MB · Views: 65
Work on the phase 6 building coming long nicely.
 

Attachments

  • IMG_6153.JPG
    IMG_6153.JPG
    5.1 MB · Views: 39
  • IMG_6155.JPG
    IMG_6155.JPG
    5.2 MB · Views: 39
  • IMG_6157.JPG
    IMG_6157.JPG
    7.3 MB · Views: 39
  • IMG_6161.JPG
    IMG_6161.JPG
    7.3 MB · Views: 36
  • IMG_6162.JPG
    IMG_6162.JPG
    5.4 MB · Views: 40
  • IMG_6168.JPG
    IMG_6168.JPG
    5.6 MB · Views: 38
Phase 4/5 West building.
 

Attachments

  • IMG_6143.JPG
    IMG_6143.JPG
    6 MB · Views: 39
  • IMG_6145.JPG
    IMG_6145.JPG
    5.2 MB · Views: 41
  • IMG_6147.JPG
    IMG_6147.JPG
    6.2 MB · Views: 38
  • IMG_6170.JPG
    IMG_6170.JPG
    5.3 MB · Views: 39
  • IMG_6171.JPG
    IMG_6171.JPG
    5.7 MB · Views: 40
  • IMG_6173.JPG
    IMG_6173.JPG
    5.5 MB · Views: 40
Phase 4/5 East building.
 

Attachments

  • IMG_6149.JPG
    IMG_6149.JPG
    5.9 MB · Views: 46
  • IMG_6150.JPG
    IMG_6150.JPG
    5.6 MB · Views: 44
  • IMG_6151.JPG
    IMG_6151.JPG
    6.1 MB · Views: 45
  • IMG_6165.JPG
    IMG_6165.JPG
    6.9 MB · Views: 47
  • IMG_6166.JPG
    IMG_6166.JPG
    6.3 MB · Views: 41
  • IMG_6167.JPG
    IMG_6167.JPG
    6 MB · Views: 41
  • IMG_6169.JPG
    IMG_6169.JPG
    5.4 MB · Views: 41
  • IMG_6173.JPG
    IMG_6173.JPG
    5.5 MB · Views: 49

Back
Top