Usually you buy it from the owner.
And when the owners are unwilling to sell and one has far more money for lawyers than you want to spend on the project?Usually you buy it from the owner.
One of the other major limiting factors was a lack of Positive Train Control on the line, significantly limiting the number of daily trips (I believe to 12, hence only one additional train). But CSX is nearly finished installing PTC the entire way to Brunswick. There still isn't presently sufficient rolling stock to run more trains, but going forward at least one of the significant limitations should no longer be issue.Don’t forget that the Wells Area Improvement Project (the expanded Wells Station plus 6 miles of double-tracking) is intended to support one additional Downeaster round-trip between Wells and Brunswick during rush hour. Even though it would be under the Downeaster brand, this will be (de facto) the first Portland-centric commuter rail service. Whether there are any other corridors that make sense for commuter rail as the mode, to make it a commuter rail network, I don’t know — but you can do a lot of good even with just one line.
First floated in 2019, the proposed Amtrak Downeaster stop in West Falmouth is still on track to — maybe — become a reality someday.
The Northern New England Passenger Rail Authority first floated the idea for a passenger rail stop to the Falmouth Town Council seven years ago. In addition to serving Falmouth residents, the station would better connect the Interstate 95 corridor to the Downeaster and reduce demand for parking at the Portland Transportation Center, said Falmouth Town Manager Nathan Poore when providing an update to the council on Monday.
The station would be located at the shopping center on Gray Road adjacent to the rail line, likely on the property near the Dunkin’, which borders a steep decline down to the tracks. The project is still in the concept phase, said Poore.
“It is in our growth corridor and it would be a nice transit-oriented type (of) development in that location,” said Poore.
The station would likely include a platform and ticketing area, but no buildings, said Poore. It would include either one or two levels of a parking garage, he said.
The construction would not cost Falmouth taxpayers, as the rail authority would fund the facilities, including parking. Once the station is built, it would be the town’s responsibility to maintain it. The town could find partners to manage the station, said Poore.
As a Brunswickian, I hope this station never materializes. Train speeds are relatively high in this area, I’d hate to lengthen what is already a ridiculously long ride to Boston by coming to a complete stop for a park and ride in a community that has easy access to the PTC and is already served by the METRO bus service.![]()
Plan to build a Downeaster stop in Falmouth is still alive — sort of
The station in West Falmouth was first proposed in 2019 by the Northern New England Passenger Rail Authority, but the project hasn't seen much progress.www.pressherald.com
I've been saying that for AGES! There's plenty of room for a station, parking, and ancillary development! (And it would be closer to my houseOh, forgot, a Morrill's Corner mini-station could satisfy some of the Falmouth riders who want a station there.
Poker Chips....I've been saying that for AGES! There's plenty of room for a station, parking, and ancillary development! (And it would be closer to my houseSo far as I can tell, Bruno's owns just about all the land that CSX doesn't, except for the Boxing Club.
Trivia question: does anyone know what product, related to an industry that is not at all normally associated with Portland, used to be made in that area?
Unbelievable. It looks like they forgot to consider a Metro bus dropping off and picking up. Where would that happen? Not around that tight corner. The street during bad weather? And look at all that "wonderful" plaza space for the hordes who like to hang out in the front of a train station. Something is fishy about all of this, like someone at NNEPRA has perhaps a personal and undisclosed incentive in this, somewhere?Link to NNEPRA project website on cranewatch.biz:
View attachment 74971
I'll say it again: 2-car platforms at the busiest non-Boston stop for what's soon going to be fixed-length 6-car Airo trainsets is insane and disqualifying.Unbelievable. It looks like they forgot to consider a Metro bus dropping off and picking up. Where would that happen? Not around that tight corner. The street during bad weather? And look at all that "wonderful" plaza space for the hordes who like to hang out in the front of a train station. Something is fishy about all of this, like someone at NNEPRA has perhaps a personal and undisclosed incentive in this, somewhere?
Because there is no longer a median on that stretch of 95. It was removed as part of the widening to three lanes. It would thus require additional widening to maintain DOT standards. You're adding SIGNIFICANT cost at that point.