School Street Municipal Lot Redevelopment | Everett Square | Everett

12345

Active Member
Joined
Feb 18, 2007
Messages
589
Reaction score
449
The City of Everett has issued a request for proposals (RFP) for the School Street Municipal Parking Lot, which is between the Sacro Tower and Braza Bar & Grill. Acceptable uses of the property include a commercial with residential mixed-use development, a boutique hotel with a restaurant, a performance theater with an open plaza, or other combination of uses that enhance the existing character of Everett Square. Prospective developers may also work with adjacent private property owners to assemble a larger redevelopment parcel to accommodate their prospective developments

http://www.everettindependent.com/2...or-a-major-mixed-use-development-in-downtown/
 
Looks like Everett will allow much higher densities in the Commercial Triangle Economic Development District.


Building heights would be allowed by right up to 70 feet, but a Special Permit would be needed for anything 71 to 100 feet tall. Nothing over 100 feet would be permitted.

Parking would be governed by existing standards (two spaces per unit in most sections), but one exception would be for studio units that would have 0.5 spaces per studio.

Soper and Sousa said they are leaning towards creating a very dense area in the Commercial Triangle, which was evidenced from the regulations for Floor Area Ratio (FAR). A builder can build an FAR of 3.5:1 by right and up to 6:1 by Special Permit – a very dense development standard as compared to the existing apartment district that is 1:1.

http://www.everettindependent.com/2...y-could-be-game-changing-for-everetts-future/
 

Back
Top