stick n move
Superstar
- Joined
- Oct 14, 2009
- Messages
- 11,118
- Reaction score
- 15,014
Construction Starts on The Devon at Weiss Farm in Stoneham, MA
“BRAINTREE, MA–Construction is now underway at The Devon at Weiss Farm, a 259-unit multifamily LEED Silver rated project, located on an expansive 25-acre site in Stoneham, MA.
The property, edged by woods, includes walking paths set on a historic dairy farm. The first phase includes 12 townhomes, a 5,000-square-foot clubhouse and the first building with 64 apartments, scheduled to deliver in June of 2025.
Located just under 10 miles from downtown Boston, 25% of the new housing will be designated affordable through the Commonwealth’s Chapter 40B law. The Weiss Farm site has undergone a rigorous design process in order to preserve the surrounding context while creating a new space for people to gather and live. Complete with a barn that will mimic the original barn structure on site, the project works to respect the past while delivering modern and energy efficient homes that meet the needs of today’s market.
“Our great team is in place and with construction underway on this exciting project, we soon will be able to deliver much needed housing to a market in need of supply,” said Peter Mahoney of John M. Corcoran and Company. “We believe that our offering will not only introduce new housing options for local residents but draw new people to the community.”
The Devon at Weiss Farm will deliver the high-quality residential experience for which John M. Corcoran & Company is well-known. Finishes include quartz countertops, tile backsplash, LVT plank floors and porcelain-tiled bathroom floors and walls. Kitchens feature stainless steel Energy Star-rated appliances and every unit offers washers, dryers, water-efficient fixtures and LED lighting. Some homes also are highlighted by private patios or balconies, walk-in glass showers, and walk-in closets.”
https://bostonrealestatetimes.com/construction-starts-on-the-devon-at-weiss-farm-in-stoneham-ma/