Yeah, I was noticing that too. It looks like they're using some kind of pre-fab exterior wall system. A lot of times for cases of steel-framed buildings that don't use an external facade curtainwall, we've seen manual installation of steel studs, sheathing, and insulation all around the building for these exterior walls.Also, this is an interesting construction sequence. Exterior insulation (and interior non-structural wall framing) is going up with each floor of steel? Typically all the structural steel goes up first then the other trades come in afterwards.
I'm curious about the timing here. I assume there's no way they're completely done by the start of fall semester. But if this is meant to be filled with students who normally rent apartments, is it going to sit empty for a year? Or will Tufts make people break their leases in January? Or do something else with it for a year?
The temp housing is still sitting on the tennis courts, so maybe those people will move first.
Construction of Tufts’ new residence hall on Boston Avenue is steadily progressing, with project leaders estimating completion by July 2027.
[...]
The development consists of two buildings, East and West, that will house more than 660 upperclassmen in apartment-style units. Most units are four-bedroom suites featuring a shared kitchen, common area, two bathrooms and large windows.
[...]
Applications for fall 2027 occupancy in the new residence hall will officially open this July, with the option for students to join a VIP list now available.
![]()
Boston Avenue residence hall construction progresses despite winter setbacks - The Tufts Daily
Construction of Tufts’ new residence hall on Boston Avenue is steadily progressing, with project leaders estimating completion by July 2027. Led by developer group Capstone Development Partners and general contractor Erland Construction, the hall aims to ease housing pressures and reshape...www.tuftsdaily.com
So basically the 2026-27 sophomores and juniors will sign leases on these apartments for the 2027-28 academic year (moving in late-summer 2027).
I'm very curious to see what this does to the rental market in the area. Deleting demand for ~165 apartments in the surrounding neighborhoods is a big deal.