Perhaps, but unless they're explicitly a D-B procurement, the general expectation is that these projects would be Design-Bid-Build. Therefore, in the vernacular, I would consider something like contracting design for D Branch Power as advancing that project, as without it you don't even get to the bidding for construction.
And while I'll I'd concede that Im uncertain of the nature of the cited upcoming CR AFC2.0 contract, I'd point out that AFC2.0 has its own
on-call contract explicitly for installing new AFC hardware in stations.