- Joined
- Jan 22, 2012
- Messages
- 5,078
- Reaction score
- 1,656
So I guess they are just going to close the crossing while it's under construction?
I've been wondering about mitigation as well. It's not like the Longfellow where there are at least three other bridges to absorb Boston/Cambridge traffic. This is THE connection between Boston proper and Charlestown. Craigie/Lechmere will be an even bigger mess if everyone is trying to get to Charlestown that way.
As an aside, if they are just closing the crossing, doesn't it seem like they should downgrade Rutherford Ave the same time as they rebuild the bridge? Rutherford will be VERY low capacity if it's not carrying traffic to Boston from Sullivan.