I consider this good news. Thanks for the update.
Yes. But as I've said before, it looks like another years-long Big Dig-style project.
I consider this good news. Thanks for the update.
That's the problem with bridges that require renderite for construction.I mean this sincerely: For such an unremarkable span and an uninspiring design, the construction of this bridge should have lasted one week. It's some tub girders with some fake architectural steel.
I would like to shake the hand of the inspector that founds these "toe cracks". First of all who looks that closely at welds to the recolonize those small cracks (hundreds of welds, and 100s of feet of them) . Second, to have the cohones to call out the contractor on work that is less than specified, especially when its causes delays and runs into lawsuits. Nobody really wants to be that guy, but thankfully this inspector was there.
Surely that temp bridge has another good 14-26 months in it,.. right?!?
FYI - I reached out to MADOT again a couple weeks ago via phone/email and never got a response, but they just announced a virtual public info meeting set for Tuesday, 10/18 at 6:30 and Wednesday, 10/19 at 6:30. To register for Tuesday's meeting, go to virtualmeeting.link/NWSB-Public-1. To register for Wednesdays meeting, got to virtualmeeting.link/NWSB-Public-2.
The state should just shut down the MCCA, the MBTA, MassDOT, etc. and hand all their functions and responsibilities over to Massport. Out of all these agencies, it's the only one that seems to have some competence at getting things done right.
The bike lane construction on the new bridge is going to connect to the Rutherford Ave. road diet bike lanes sometime after 2025, but it doesn't help the Navy Yard, where Chelsea St. is more of a high speed racetrack kind of suburban arterial highway, separating the Navy Yard from Bunker Hill.
And how on earth did this mishap get by the inspectors?
I have no expertise here, but the cracks look pretty obvious in the photos. And there are reportedly 192 spots where it's cracked/cracking. I'm having a hard time being impressed by anyone associated with this project. Does anyone know what caused these "toe cracks?" I don't recall anything in the presentation that speaks to why the material cracked in the first place.I hope they don't forget the pedestrian walkway bridge that used to exist under the old Washington St Bridge. I recall that is still in the plans but I think after
------
They didn't get past the inspectors. These are the type of things is one of those things that might not get noticed until after the ribbon cutting is done which would be an even bigger nightmare or possibly a total disaster. Such incidents has happen in other states and countries, it is ironic, but catching this now is a reflection of the level of inspection in the state. It would more be ideal if this was caught earlier, but we have inspections at different stages for a reason - barring someone who is able to explain to me inspectors should have been able to catch this earlier within our current operating procedures, but I'm not going to presume negligence is that implied in that question. Especially given incentive to be willfully ignorant versus catching these type of defects and mitigating this now rather than after the ribbon cutting.
Go back to post #376 for a basic explanation of what appears to have happened.I have no expertise here, but the cracks look pretty obvious in the photos. And there are reportedly 192 spots where it's cracked/cracking. I'm having a hard time being impressed by anyone associated with this project. Does anyone know what caused these "toe cracks?" I don't recall anything in the presentation that speaks to why the material cracked in the first place.
Go back to post #376 for a basic explanation of what appears to have happened.
It will probably be years in court before actual blame is assigned, but it seems to be a design fault, either in aesthetic tub girders requiring thick diaphragm design or weld design (or both).Bill Russell Bridge | North Washington St.
From: https://thepointsguy.com/news/boston-new-york-seaplane-review-tailwind-first-flight/amp/archboston.com
Welds are failing due to uneven heating then cooling of the thick materials.
Well whether you believe it or not, the City and Commonwealth had aesthetic as well as functional goals for the design. And somewhere between the design and structural engineering firms they screwed up the non-standard weld planning (the type of design used here is not common, but apparently was not accounted for in the weld planning and instructions.)No such thing as "aesthetic tub girders." This is a highway overpass.
Heating and cooling of welds is an issue that has been known about for at least 80 years.
Again, for the middling design goal, this could have been done in a single week.
I personally don't believe that anyone had aesthetic goals for the design because it looks like a highway overpass.Well whether you believe it or not, the City and Commonwealth had aesthetic as well as functional goals for the design. And somewhere between the design and structural engineering firms they screwed up the non-standard weld planning (the type of design used here is not common, but apparently was not accounted for in the weld planning and instructions.)
Sure weld heating and cooling is a well known issue, but the MAGNITUDE of the issue here was unexpected (whether it should have been or not).
Clearly somebody screwed up. But I really doubt you or anyone could do this in a week