Delvin4519
Active Member
- Joined
- Oct 8, 2022
- Messages
- 822
- Reaction score
- 1,478
The above report is over 1 month out of date at the time of posting here to this site.
Here is an updated refreshed report through late-March. The timeline of the updated construction report is validated via checking the schedule of events at TD garden being updated to reflect future dates instead of historical dates.
Description of Scheduled Work:
Additionally, MBTA bus schedules were updated on March 12th, 2023. At this time, there are no changes to Route 92 or 93 bus service that connects Charlestown and North End via the bridge.
Here is an updated refreshed report through late-March. The timeline of the updated construction report is validated via checking the schedule of events at TD garden being updated to reflect future dates instead of historical dates.
Description of Scheduled Work:
- Installation of bridge deck formwork
- Installation of sidewalk steel and formwork
- Installation of electrical utility conduits on bridge structure
- Installation of gas and water utilities on bridge structure
Additionally, MBTA bus schedules were updated on March 12th, 2023. At this time, there are no changes to Route 92 or 93 bus service that connects Charlestown and North End via the bridge.