The shoe is the slowest going exterior cladding job I have seen in a long time. There must be a supply chain issue happening with all the work going up in boston because this should have been tight months ago.
They were working on installing the facade on the bow today. Drywall and interior fitting installation has been ongoing on the upper floors for most of the month.