Broad Institute Expansion | 75 Ames Street | Cambridge - Kendall Sq

Interior renderings

223A5851-0DCD-4A9C-B121-20EE2686870B.jpeg
 
It looks like it was just shell space that they are fitting out.

Got to love how this mundane build-out of existing shell space on an upper floor somehow requires the City of Cambridge Special Permit process. Yet, building a whole new (ill-fitting) lab building at 34-40 Hampshire was a quick under the radar as-of-right building permit (in place of what was supposed to be a special-permitted hotel building). I am sure there is a logical zoning-based reason for this, but it is still a ridiculous comparison from a community relations standpoint.
 
Planning and permitting as tools to reinforce existing power structures.
 

Back
Top