I've been stuck with contractors like this in the past who bite off more than they can chew and have only one crew to hit up multiple sites. Either they burn out or they recognize something's wrong and correct it. My gut tells me it's the former for these guys.
They are responsible for Hotel 1868, Mass Ave in Porter Sq. https://www.hotel1868.com/?&msclkid...c77053662d6b1f35737b32708f2acef3&gclsrc=3p.ds
It turned out alright and seems to be of decent enough quality but a couple of strange things happened during construction. Maybe half the foundation had been excavated when it was inexplicably all filled in again. A large section of the first floor had been framed out in wood but was then taken down and replaced with steel.
IMG_7086
IMG_7087
IMG_7090
IMG_7091
IMG_9021
IMG_9022
IMG_9023
IMG_9863
IMG_9865
IMG_9870
IMG_9868
IMG_1188
IMG_1191
IMG_1192
IMG_1193
IMG_1475
IMG_1477
IMG_1478
IMG_1479
IMG_1480
IMG_3913
IMG_3915
IMG_3916
IMG_7489
IMG_7491
IMG_7492
IMG_7493
IMG_7494
Poshtel 7/14/22
Poshtel 7/21/22