That sucks, I had expected this to be done in time for the marathon.(Sad trombone)
Looking like December 2024
Improvements to Copley Square Park
CONSTRUCTION NOTICE: Renovations to Copley Square Park started on July 20, 2023. We expect this project will take 16 months, and will be reopened in December 2024. Construction updates are listed below on this page, in the "related documents" section.www.boston.gov
They're commonly used to protect the base of the tree from the errant hit by a bobcat or workers moving bulk material onto sites.These planks around planted trees, do ther actually work to hold it up? Seems so odd and I see it a lot
Mid-construction photo before the existing trees grow any leaves, or any of the new ones get planted. The jokes write themselves."Shaded Grove" - I was lead to believe that any shade on Copley Square would instantly cause Trinity to burst into a fireball engulfing the Square and old wing of the library instantly. Also, "grove", given the picture, writes its own jokes I feel.
Unacceptable that this will be closed for 2 summers for this project which is really not that complex.
I'm shocked at how incompetent this revamp actually is. The design approach seems to be to just plop down more inexplicable landscape features and paths in random directions through the square. Raised Grove? WTF is this?
I don't have strong opinions on the overall landscaping, but I do think there is a significant upgrade in the orientation of pedestrian paths. The new design follows the natural orientation for walkers transiting the square. That's a good thing that is not random, and is much more favorable to pedestrians than the old design.I'm shocked at how incompetent this revamp actually is. The design approach seems to be to just plop down more inexplicable landscape features and paths in random directions through the square. Raised Grove? WTF is this?
The stream line reference made me smile. Apropos of nothing, I was reminded of those classic Sorkin-authored West Wing episodes when the Ainsley Hayes character was assigned an office in the Steam Pipe Trunk Distribution Venue.So having read the updates, a few notes.
1) think of the raised grove as sort of a deck. The old paving around the trees apparently was stressing the trees due to restricted soil volume, and constricting their root space, and this deck will evidently alleviate that so this is apparently mostly a tree preservation exercise. The same applies to a lot of the tree planters.
2) much like Government Center, the park on top is seemingly getting renovated mostly as a cover for what needed to go under it - new drainage structures and infrastructure, things like a steam line that used to run under Huntington Ave across the site, leading to much of the cost and time.
3) I get the impression that Trinity Church itself wanted the flip of lawn and plaza. I don't necessarily disagree with them, since Trinity should by its very nature be a lower energy space. The modeling attached was from an earlier design iteration , but I think the fundamentals are still sound. So yes, I do think that lawn is intended as a isolator that still provides a site line, but means the market stalls, marathon celebrations and other events are stood back rather than at its front door, but I do think it was thought about and is intentional.
4) interestingly enough, the BosTix kiosk got a water line for future cafe conversion.
It's amazing to me that this is a $17 million project. Is there anything really new here, besides some added trees and tables/chairs? Even the fountain will be 'renovated' and not new. Yes, they are shifting some hardscape and grassy areas and adding some pedestrian paths, but none of that would seem to be especially costly.