East Boston Infill and Small Developments

Ive been wondering the same thing. It was supposed to be I believe the second phase of portside at pier one, but then it just never happened and there hasnt been a peep in over a decade.


Heres an old rendering and article from 2012 in the herald, but theres really not much info
7b7e89_Portside_at_Pier1.jpg


This npc says construction was supposed to start in 2015

But at the same time the project is listed as complete on the site so not sure whats going on. Its a massport property so it appears theyre just holding on to it right now, not sure why.
Ah so I do know some of the history for this. All of that area as illustrated was part of a single master planned project of 7 buildings, which Massport ground leased out in 2000 to Roseland (now Veris) which led to an eventual groundbreaking in 2006. The financial crisis forced a pause on construction until 2013 or so, when they resumed building 7, then built buildings 5 & 6, the remaining terra firma parcels, through 2018, resulting, the 3 on the upper right in that illustration now standing.

However, In 2022 they ended up walking away from its remaining lease with Massport having managed to extract the most valuable bits of the site, and thus the pier itself, citing the costs of rebuilding the pilings, whereupon massport promptly issued an extended lease to the tall ship. I don't know what's up with their public benefit obligations, but apparently they opened a community meeting room last year.
Screenshot_20260729_185224_Chrome.jpg
Screenshot_20260729_184923_Chrome.jpg
Screenshot_20260729_184933_Chrome.jpg
Screenshot_20260729_184944_Chrome.jpg
Screenshot_20260729_184956_Chrome.jpg
Screenshot_20260729_185058_Chrome.jpg
 

Back
Top