Equilibria
Senior Member
- Joined
- May 6, 2007
- Messages
- 7,002
- Reaction score
- 8,124
2022-06-28_Presentation_Exchange South End.pdf | Powered by Box
bpda.app.box.com
Update from IAG meeting 6/28. Sounds like the developer has been working over the past year to figure out the connection to 93. If I'm reading it correctly, there is only going to be a connection from 93, not both ways. This might lead to a reduction in the two buildings closest to the highway.
Thanks for sharing! Worth noting that the connection would be from the frontage road, not from mainline I-93.