F-Line to Dudley
Senior Member
- Joined
- Nov 2, 2010
- Messages
- 9,261
- Reaction score
- 9,268
Re: Fall River/New Bedford Commuter Rail
Yes. Although at least they cluster the double tracking near the stations so they don't have to touch those and have another NIMBY fight when they come back to infill the double track later. All of the Taunton-north stops except Easton Village get built as double. Easton Vill. omitted because the historic station building is pain in ass to graft a full-high onto, so they're not touching that side of the ROW until they absolutely have to.
Taunton Depot, BTW, has to be tri-tracked if they want a full-high platform. Middleboro Secondary is a freight clearance route. Looks like CSX hit the Task Force with a rolled-up newspaper and said don't fuck with their business, because that's a late addition to the design that wasn't there in the prior engineering schematics for the station.
Although these geniuses still haven't considered that full-highs on the two branches are going to put a slight damper on Massport's plans to get some major ship-to-rail business out of the FR and NB ports after the shipping channels there get dredged and deepened. Both probably would've gained slightly better business prospects if they could ship wide-load freight, because right now Everett Terminal is the only port in the state that can do that. But alas...Freetown must get its candy, local industrial base and I-95 truck traffic be damned.
Check out the last few pages where it shows the proposed single and double tracking segments.
That's a lot of single tracking.
Yes. Although at least they cluster the double tracking near the stations so they don't have to touch those and have another NIMBY fight when they come back to infill the double track later. All of the Taunton-north stops except Easton Village get built as double. Easton Vill. omitted because the historic station building is pain in ass to graft a full-high onto, so they're not touching that side of the ROW until they absolutely have to.
Taunton Depot, BTW, has to be tri-tracked if they want a full-high platform. Middleboro Secondary is a freight clearance route. Looks like CSX hit the Task Force with a rolled-up newspaper and said don't fuck with their business, because that's a late addition to the design that wasn't there in the prior engineering schematics for the station.
Although these geniuses still haven't considered that full-highs on the two branches are going to put a slight damper on Massport's plans to get some major ship-to-rail business out of the FR and NB ports after the shipping channels there get dredged and deepened. Both probably would've gained slightly better business prospects if they could ship wide-load freight, because right now Everett Terminal is the only port in the state that can do that. But alas...Freetown must get its candy, local industrial base and I-95 truck traffic be damned.