I wish i could remember which board meeting it was part of to verify and cite but in one of them Eng stated that the vast majority of all track construction is complete and as stated already in here the remaining works are signals and punch list items. The goal is for everything related to line functionality to be completed by the end of this year. Then for the first 3 months of 2024 there is required testing of the line at service speeds followed by an additional required 3 months of crew qualifications and mock service running to dial-in schedule timings for the Summer ‘24 CR schedule.South Coast Rail's completion deadlines keep slipping with wide uncertainty as to whether it'll actually launch in Summer 2024, so it's not reliable at all to plan anything around on other modes. The latest rumor on RR.net is that the Franklin Line Double Tracking project is being paused until further notice so its track gangs can be reassigned to SCR to staunch the bleeding there on construction delays. It's incredibly unlikely that any Red Line work schedules are being drawn up with dependencies on SCR. It's simply too iffy at this stage.
Plus it's not going to increase service any on the mainline. There'll be a light redistribution of slots, but it's functionally useless for providing more backstop service inside 128.
It’d make sense that Franklin Line personnel are being pulled to ensure all necessary items are wrapped up for the end of this year to not delay those fixed 6 months needed.