Been a few months, not much new to update on:
1) The parking lot in the front of the site is still a parking lot (the hotel)
2) Concrete casting for the 1st floor is still slowly proceeding (the residence)
3) The parking garage has railings and fire suppression in now, I guess they are finishing the parking garage before moving on to the rest of the site? It doesn't look like the electrical is in yet, but it looked pretty done otherwise.
4) The extension of Roland St. to connect it to Inner Belt is paved now:
1) The parking lot in the front of the site is still a parking lot (the hotel)
2) Concrete casting for the 1st floor is still slowly proceeding (the residence)
3) The parking garage has railings and fire suppression in now, I guess they are finishing the parking garage before moving on to the rest of the site? It doesn't look like the electrical is in yet, but it looked pretty done otherwise.
4) The extension of Roland St. to connect it to Inner Belt is paved now: