I-90 Interchange Improvement Project & West Station | Allston

The May 15 Task Force meeting will be held at the Josephine A. Fiorentino Community Center, 123 Antwerp St., Brighton, MA from 6 pm – 8 pm.
The meeting agenda, which is subject to change, is proposed as follows:
  • Welcome/Introductions
  • Layover Update
  • Multimodal Local Connections
  • Temporary Grand Junction Rail Outage
  • Next Steps
Attached is a Layover Response document that was prepared to respond to questions and comments previously received. This is meant as a supplement to the presentation made during the April 16th Task Force Meeting.
 

Attachments

  • AMP Layover Response 4-30-25.pdf
    1.8 MB · Views: 39
Attached is a Layover Response document that was prepared to respond to questions and comments previously received. This is meant as a supplement to the presentation made during the April 16th Task Force Meeting.
They're totally dodging the most important question: Readville Yard 1 temp layover provides more total space than Beacon Park, so why are they planning to abandon it when the Yard 2 VMF and layover are complete? They're literally throwing away an investment to dig in on Beacon Park layover at twice the price.
 

I-90 Project: Is This The Best We Can Do?​

  • Wednesday, June 11, 2025
  • 6:30 PM 8:00 PM
  • Josephine A. Fiorentino Community Center123 Antwerp Street Brighton
The Allston Multimodal (I-90) Project entails straightening the Mass Pike, building a new commuter rail stop, and enabling a new neighborhood to be built on what is now an abandoned rail yard. Join us for a free presentation and Q&A at the Josephine A. Fiorentino Community Center to discuss the project and design options to improve water quality and naturalize the riverbank. Light refreshments will be served.
 