Kendall Common ( née Volpe Redevelopment) | Kendall Sq | Cambridge

Per correspondence posted by the Cambridge Redev. Authority:

Proposed Demolition - Kendall Common (formerly known as the Volpe parcels)
"Demolition of four of the existing structures located south of Potter Street is anticipated to commence in early 2025 and continue through completion in Spring 2026"

I am assuming this includes the tower, since there are four buildings in total south of Potter:
vp_dmo-1.png

Google Maps

There are also a couple of legacy Volpe structures north of Potter (along Binney) that I'm assuming are not included in this stage.
 
Last edited:
There are crews working along the fence line today. I think they are removing the cables used to strengthen the fence against vehicular impact.
 

Back
Top