Kindred Hospital Site Redevelopment | 1515 Commonwealth Ave. | Brighton

Quite a lot of progress at this site!

1515_Comm_Ave_Oct_2_2022.jpg
 
Crane being assembled for the taller building. The core is right outside the right edge of this photo.
20230407210122_IMG_3748.JPG
 

Attachments

  • 20230407210122_IMG_3748.JPG
    20230407210122_IMG_3748.JPG
    195.9 KB · Views: 27
Davis and TOCCI celebrate topping off of eight-story
102-unit building


1515%20Topping%20Off%201.JPG


“Boston, MA The Davis Companies (Davis) and TOCCI Construct, LLC (TOCCI) celebrated the topping off of a new luxury residential housing development at 1515 Commonwealth Ave. in the Brighton neighborhood.

Upon completion in the fall of 2024, the redevelopment of 1515 Commonwealth Ave. will deliver 253 units of luxury housing split between two buildings: 1515 Commonwealth Ave., an eight-story condominium building totaling 102 units; and Hew, a seven-story, 151-unit rental apartment building. Set on a two-acre hilltop site with unobstructed views of downtown, the property will provide more than 30,000 s/f of landscaped green space, along with a new pedestrian path to Overlook Park.”

1515%20Topping%20Off%203.JPG



https://nerej.com/davis-and-tocci-celebrate-topping-off-of-eight-story-102-unit-building
 
Davis and TOCCI celebrate topping off of eight-story
102-unit building


1515%20Topping%20Off%201.JPG


“Boston, MA The Davis Companies (Davis) and TOCCI Construct, LLC (TOCCI) celebrated the topping off of a new luxury residential housing development at 1515 Commonwealth Ave. in the Brighton neighborhood.

Upon completion in the fall of 2024, the redevelopment of 1515 Commonwealth Ave. will deliver 253 units of luxury housing split between two buildings: 1515 Commonwealth Ave., an eight-story condominium building totaling 102 units; and Hew, a seven-story, 151-unit rental apartment building. Set on a two-acre hilltop site with unobstructed views of downtown, the property will provide more than 30,000 s/f of landscaped green space, along with a new pedestrian path to Overlook Park.”

1515%20Topping%20Off%203.JPG



https://nerej.com/davis-and-tocci-celebrate-topping-off-of-eight-story-102-unit-building

The fact that the condo tower only ended up as 8 stories instead of 15-17 as originally proposed is a shame. That parcel is an excellent spot for height.
 
Still progressing up on the hill.

IMG_9698.JPG


Tower getting the air vapor barrier treatment. The entry portal area/ lobby entry.

IMG_9669.JPG
IMG_9662.JPG



Some exterior materials on the lower building.


IMG_9640.JPG
IMG_9641.JPG






IMG_9621.JPG
 

Attachments

  • IMG_9626.JPG
    IMG_9626.JPG
    4.3 MB · Views: 21

Back
Top