THE PROJECT TO DATE
In 2017, QMG’s affiliate QMG Huntington, LLC, and HTC applied together to the BPDA to undertake a two-phased project (the “Article 80 Project”) at the Project Site.
The Project received a Scoping Determination Waiving Further Review from the BPDA Director, dated May 7, 2018 (“2018 Determination”). A copy of the 2018 Determination is attached as EXHIBIT A.
As described in the 2018 Determination, the two phases entail:
• Chapter 121A Project: The demolition of the two buildings at 252-258 Huntington Avenue, and construction in their place of an approximately 405,500 square foot, 32- story (362 feet tall) mixed-use building (the “Tower”) with up to 426 residential units,
approximately 7,500 square feet of retail/restaurant/services space on the first two levels, approximately 14,000 square feet of cultural space for use by HTC; and approximately 114 parking spaces in an underground garage (the “Chapter 121A Project”); and
• Huntington Theatre Project: The renovation of the existing Huntington Avenue Theatre and the replacement of the existing annex building behind it (the “West Wing”) with an approximately 37,000 square-foot, five- (5-) story (70 foot-tall) building with two stories
below grade (the "Huntington Theatre Project").
Each phase is to be undertaken by separate entities, QMG and HTC, respectively
.