real_EthanHunt
Active Member
- Joined
- Jul 18, 2019
- Messages
- 242
- Reaction score
- 396
RFP for Parcel H is already out from Massport. it includes air rights over the existing Silver Line way station.Build the next -- Super Station -- Underground Silver Line Way Station connecting with the tunnel under D Street -- this is a small amount of digging which can easily be packaged into Air Rights development of the existing Silver Line Way surface station and accompanying parking lot [Massport]
Some bureaucratic mumbo-jumbo is needed to merge properties from the two parts of the Commonwealth ostensibly in the transportation business [Massport and the MBTA] both technically report through the same chain to the governor
Massport Puts Out RFP for Parcel H in Seaport
Massport's latest news and press releases.
www.massport.com
- Parcel size of 46,500 square feet (1.1 acres);
- Site is bounded by Congress Street, Starboard Way, Silver Line Way, and Port Lane;
- Potential to expand the project site by an additional 62,000 square feet (1.4 acres) by overbuilding the Silver Line;
- Overall potential for up to 600,000 square feet of transit-oriented, mixed‐use development;
- Building height up to approximately 240 feet above mean sea level (approximately 230 feet above grade);
- Opportunity for public realm improvements, including improvements to the MBTA Silver Line Way stop;
- Parking available in Massport’s South Boston Waterfront Transportation Center (SBWTC), a 1,550‐parking space facility.