MBTA Construction Projects

Re: T construction news

Hasty photos while passing through Wollaston:

29195819988_87baf9de4c_h.jpg


42164384445_148ef4b0b0_h.jpg


42349448914_f57c5bc3a8_h.jpg


42349446334_8fa370e779_h.jpg


42164381035_c0038c11ab_h.jpg


28199665627_f8336fefa5_h.jpg


29195811098_d1f0bdc62c_h.jpg


29195811028_49bae822fa_h.jpg
 
Re: T construction news

Did they tear the whole thing down & are rebuilding it all over again?!They should get that graffiti off the wall while thay're at it. :eek:
 
Last edited:
Re: T construction news

GLX-Union has extensive work going on with the Fitchburg tracks, which are being shifted over to the southern side of the embankment, presumably to clear space for the LRT tracks.
 
Re: T construction news

Did they tear the whole station down & are rebuilding it all over again?!They should get that graffiti off the wall while their at it. :eek:

Yes. Only thing left is the actual concrete structure of the original station. Will be getting a new platform, canopy and headhouse on the parking lot side. A modest headhouse will be on Newport Ave with stairs and a switchback ramp.
 
Re: T construction news

Thanks. Can't wait to see it!! it'll look even better with the forthcoming new Red Line trains! :cool:
 
Re: T construction news

The MBTA is currently expanding the Wellington train yard and maintenance facility in Medford. The work is necessary to accommodate an entire new fleet, the agency said Wednesday.

This will include adding a new bay, a second car-hoist, an electronics room, better staff facilities and more upgrades to the maintenance facility, as well as replacing the roof.


https://patch.com/massachusetts/medford/wellington-mbta-yard-expanding-medford
 
Re: T construction news

Here's how the Winter Street Concourse turned out. Love the paint job telling you which way you're going:

29600445118_b0a6e96422_h.jpg


42754791334_a5a3533e57_h.jpg
 
Re: T construction news

I dont like the sitting is BANNED
 
Re: T construction news

I’m guessing it’s less about sitting and more about sleeping.
 
Re: T construction news

I don't feel like they've done anything to make laying down more difficult.

Right, the spaces on the black ledge behind the railing and between the pillars make nice little separated bunks. When the weather is bad you'll always find people sleeping in those spots. By and large, they don't disturb commuters and commuters don't disturb them.
 
Re: T construction news

Seems like such a wasted opportunity to do something interesting like add in retail/stalls or something.
 
Re: T construction news

Seems like such a wasted opportunity to do something interesting like add in retail/stalls or something.


Yeah, too bad that they don't put some concessions, seats & small tables in there so commuters can stop & get a bite to eat. Like maybe a Dunkin Donuts or something.

The homeless have been laying down & sleeping behind the barriers there. Probably why it was done to discourage them from doing that.

It looks much better than it did with those ugly dull partition walls there though. All that was kept behind there were construction clutter! Looks much brighter. LED lighting? :cool:
 
Re: T construction news

I actually kind of like that. If I were homeless this would be great to avoid being as visible to bystanders for both safety and privacy. Seems like a potentially revanchist policy backfired :p
 
Re: T construction news

I am a space cadet and missed my stop the other day, so here are some new pictures of Wollaston heading south, and then a video heading back north:

43224926265_9f6f09da43_h.jpg


43412776344_06774b8fd0_h.jpg


43224924655_8a154db835_h.jpg


43224923675_f8a0204c7c_h.jpg


43224922775_4620430d18_h.jpg


44083314462_96765b2a44_h.jpg


43224920915_031960a99e_h.jpg


43412772704_5514471fc3_h.jpg


43224919315_0c104b198c_h.jpg


43412771414_315997b0be_h.jpg


29193880957_8e8913da77_h.jpg


43412769894_9e663ae7db_h.jpg


29193879137_3a80796dac_h.jpg


43412768824_059847d264_h.jpg


29193877517_ea08069b28_h.jpg


44083129102_3f628bcdde_h.jpg


42322723020_68c0d0f639_h.jpg


29193891147_f7aac7d166_h.jpg


43412778724_2994bedff4_h.jpg


44083315782_50348f82d5_h.jpg


43412777664_2720743fa0_h.jpg
 
Re: T construction news

^ Steve, thanks for the great pix & vid of Wollaston. Very comprehensive.

---

Also,

GLX is ahead of schedule:

https://www.facebook.com/53151441680/photos/a.167862596680/10155485674016681/?type=3&theater

The recently released Annual Status Report on the Green Line Extension project lists new, earlier dates for the start of GLX service: April 28, 2021 for the branch to Union Square in Somerville, and July 10, 2021 for the branch to College Avenue in Medford. Previous projections were for service to start by December 2021.

39441163_10155485674021681_1578090517785214976_o.jpg
 
Re: T construction news

I am a space cadet and missed my stop the other day, so here are some new pictures of Wollaston heading south, and then a video heading back north:

Hopefully with City of Quincy realizing the world didn't end when the Great Mistake garage at Quincy Ctr. closed, they'll start warming up to the idea of putting Wollaston on a severe parking diet too. 550 spaces is hugely unnecessary waste of asphalt in a dense residential neighborhood lacking much in way of direct high-capacity thoroughfares to a major commuter highway. The whole southeast lot is worth 100K sq. ft. of redev space fronting the Beale/Greenwood block. Simply TOD'ing that slab still leaves 150+ spaces remaining on the more oddly-shaped and lower-value northwest lot...arguably still a bit too much capacity for a neighborhood walk-up stop but very effective nonetheless as a step-down total from ridiculous over-capacity.

With QC garage's demise, Wollaston is the new #1 most unnecessary parking glut on the rapid transit system and the proverbial "one of these is not like the others" sticking out on the list of stops bearing 450+ parking spaces.
 
Re: T construction news

I have update photos for a number of projects coming. I'll post them here as I upload them to Commons. All were taken between December 27 and 30, and clicking on the images will take you to the file description page with the full-size image.

First, progress on the new mini-high platforms and ramps at Mansfield. The underpass ramps are largely complete, but apparently there's a code issue so the whole project is delayed until the end of 2019. Here's the outbound ramp and the inbound platform supports.





Track has been laid for most of the new Red Line test track, and the building foundation is in place.

 

Back
Top