Equilibria
Senior Member
- Joined
- May 6, 2007
- Messages
- 7,230
- Reaction score
- 8,765
Last edited:
...and looks like they'll be repurposing some of the derelict car wash's corrugated metal. Sustainability in action ; )
McGrath highway ain't the most appealing place for a hotel, this is a 6 lane stroad.
As with the version of the project approved in 2023, Applicant will continue to provide space for a 14 foot clear ramp to be built across the Cambridge portion of the property to connect the McGrath/O’Brien Highway with the Community Path Extension via a spur to be constructed on MBTA property at the rear of the site.