tangent
Senior Member
- Joined
- May 11, 2012
- Messages
- 1,789
- Reaction score
- 68
Bidding process has started to replace the two North Station drawspans with two three-track drawbridges.
Per the Globe:
https://www.bostonglobe.com/metro/2...-chokepoint/ONPkIqyHk1R2QKC1Sm8wBM/story.html
Should just build a new North station at Boston Sand and Gravel. All this to get trains just across the river and then stop.
Seriously, for $100 million (the cost to just design it)... they could buy out Boston Sand and gravel and build a bunch of platforms on the North side of the river. And then most people can just walk over a pedestrian bridge, transfer to the Orange line or Green Line or whatever.
That configuration would eventually work better with NSRL and a new underground "North Station" also.
Last edited: