Developer: Trinity Financial
Architect: ICON Architecture
Units: *373 proposed (replacing 331 BHA units + 42 units non-public housing)
- 194 in mid-rise buildings
- 179 in townhouses
*UPDATE 05/04/18:
NPC filed 04/26/18: http://www.bostonplans.org/getattachment/dc593539-5787-46ed-92da-c829c5beb6b7
The NPC proposes to eliminate all 42 market rate units.
Description:
EPNF Filed May 25, 2016: http://www.bostonredevelopmentauthority.org/getattachment/912c8b94-4f70-4b52-bac0-d354eae53500 (Warning: Large)
Renders
05/04/18 NPC UPDATE:
Architect: ICON Architecture
Units: *373 proposed (replacing 331 BHA units + 42 units non-public housing)
- 194 in mid-rise buildings
- 179 in townhouses
*UPDATE 05/04/18:
NPC filed 04/26/18: http://www.bostonplans.org/getattachment/dc593539-5787-46ed-92da-c829c5beb6b7
The NPC proposes to eliminate all 42 market rate units.
The Project Change is limited to the following minor modifications:
•Elimination of 42 non-public housing units in former Phase Four of the Original Project, reducing the Revised Project to three phases (or more depending on the availability and timing of funding), and focusing on one-for-one replacement of the existing public housing units.
•The existing Community Center will now be renovated rather than newly constructed; new community space will also be provided in the Phase Two midrise building.
•Improvements to open space on the Project Site’s northwest corner bordering Waldemar Avenue will be delivered as part of Phase Two.
•Elimination of the connection of Vallar Road and Waldemar Avenue in the Project, due to cost constraints and the challenges of a large grade change between the two roadways. The Revised Project has been designed so this roadway connection could potentially be made in the future by the City of Boston.
•Reduction of some vehicle parking spaces since 42 non-public housing units were eliminated. The approximate parking space ratio from the Original Project has been maintained in the Revised Project.
Description:
1.3 PROJECT SUMMARY
The Project involves the construction of new residential buildings and hardscape ranging
from two to five stories, as well as a new community center and landscaped public areas
including a new public park. Significant roadway and connectivity improvements, including
the removal of the cul-de-sac at the end of Vallar Road, a new connection northward to
Waldemar Avenue, and the construction of on-street and off-street parking spaces, will be
made as part of the Project.
A total of 373 new housing units are proposed, replacing the existing 331 obsolete 1950sera
BHA public housing units on a one-to-one basis, with an additional 42 units of nonpublic
housing to create a revitalized mixed-income community. The Project will
accommodate 194 units in midrise buildings and 179 units in townhouses. The Project will
be constructed in multiple phases beginning in 2016 and completed by approximately
2024 depending on available financial resources and market conditions. The Proponent will
comply with the City of Boston’s Inclusionary Development Policy as applicable. See Figure
1-3, Project Site Plan.
EPNF Filed May 25, 2016: http://www.bostonredevelopmentauthority.org/getattachment/912c8b94-4f70-4b52-bac0-d354eae53500 (Warning: Large)
Renders
![e6cy7Uu.png](http://i.imgur.com/e6cy7Uu.png)
![e2KojmT.png](http://i.imgur.com/e2KojmT.png)
![D8CJAUb.png](http://i.imgur.com/D8CJAUb.png)
![9cMbh5U.png](http://i.imgur.com/9cMbh5U.png)
![rSBqKMu.png](http://i.imgur.com/rSBqKMu.png)
![JgavZyG.png](http://i.imgur.com/JgavZyG.png)
![DnCnDpj.png](http://i.imgur.com/DnCnDpj.png)
![yX4C7DC.png](http://i.imgur.com/yX4C7DC.png)
![LO8eUd2.png](http://i.imgur.com/LO8eUd2.png)
![onqfAT5.png](http://i.imgur.com/onqfAT5.png)
![XS5ttRg.png](http://i.imgur.com/XS5ttRg.png)
![By8d8Hu.png](http://i.imgur.com/By8d8Hu.png)
![RCWcTHt.png](http://i.imgur.com/RCWcTHt.png)
![56SqJUS.png](http://i.imgur.com/56SqJUS.png)
![3waKmw7.png](http://i.imgur.com/3waKmw7.png)
05/04/18 NPC UPDATE:
![XtyHt61h.png](https://i.imgur.com/XtyHt61h.png)
![FgV1u17h.png](https://i.imgur.com/FgV1u17h.png)
![KUMVINkh.png](https://i.imgur.com/KUMVINkh.png)
![IkmE3vVh.png](https://i.imgur.com/IkmE3vVh.png)
![hEWGDOxh.png](https://i.imgur.com/hEWGDOxh.png)
![KBayq0bh.png](https://i.imgur.com/KBayq0bh.png)
![DTRBOYph.png](https://i.imgur.com/DTRBOYph.png)
![YSD6xJMh.png](https://i.imgur.com/YSD6xJMh.png)
![oG5Pvn5h.png](https://i.imgur.com/oG5Pvn5h.png)
![FVlAUG0h.png](https://i.imgur.com/FVlAUG0h.png)
Last edited: