themissinglink
Active Member
- Joined
- Jan 13, 2018
- Messages
- 839
- Reaction score
- 2,623
Bill H.5248 (from January) mentions a study regarding an extension of the Red Line from Alewife into Arlington. How realistic would it be for RLX to be constructed or completed within the next 15 years?
the Massachusetts Department of Transportation shall conduct a feasibility study relative to extending the Massachusetts Bay Transit Authority red line from Alewife station in the city of Cambridge to include no less than one stop in the town of Arlington; provided further, that the study shall include (a) an analysis of all public transportation options, including, but not limited to, light rail; and (b) an evaluation of the costs and economic opportunities related to extending rail service between Alewife station in the city of Cambridge