LexSEDotVille
Active Member
- Joined
- Apr 23, 2022
- Messages
- 157
- Reaction score
- 832
10/17
10/18
10/18
The crane base is up on this one. I wasn’t able to capture a decent photo from the bike path due to the fencing.
Incidentally, there appears to be a redundant thread for this project. Can the mods merge them?
Construction has been paused due to the glut of lab space. See recording of the Somerville City Council meeting on the 23rd of May: https://somervillema.granicus.com/player/clip/2529, at 6:35.The excavation appears to have stalled out. Looking down from the bike path, I can see a large ledge exposed. I hope they’re not delayed on account of blasting.
I've gone by a few times the past few months on the Somerville Community Path sky bridge - it still looks like the soil is getting removed. Maybe they just stopped very recently?Construction has been paused due to the glut of lab space. See recording of the Somerville City Council meeting on the 23rd of May: https://somervillema.granicus.com/player/clip/2529, at 6:35.
I thought the building next door was meant to be a hotel?The lab project next door is still trying to get all its permits in order. They’re at the next ZBA meeting trying to get one renewed.
That's gonna be a deep hole left lying around...
The easier to build a 50 story residential tower now once Jerome Powell starts decreasing the Fed rates..............Pivot and focus, folks!
That’s the other side. 35 McGrath is the faceless telecom hotel closer to the Squires Bridge.I thought the building next door was meant to be a hotel?
That's gonna be a deep hole left lying around...