Hey All-
Well it is time for a update of SLG construction photos. My apologizes about the delay.. June thru mid-July is busy for me, as I run an event now on the Cape. I also decided to run for City Council here in Chelsea so I've been a VERY busy person lately!
But since the last update, the project is really moving along as usual. All station has curbing. Box District and Eastern Ave now have cement pads at the stations. Cottage street also has pads at the intersection. Eastern Ave station even has some finished greenery installed.
The only station that is really lagging behind now is Bellingham Square station but my talks with the engineer(s).. both said that station would be last to finish due to a few factors, but many because of the Commuter Rail tracks being so close. But one canopy is done, and the other one is ready to be poured (I was told it takes 1-2 weeks for one to set), so by fall I anticipate the station to come along. I also was told the ADA-compliant walkway/ramp system that will connect Washington Ave to the inbound side of Bellingham Station is 'on order' and probably wont be installed until late fall.
So it's really coming along. I anticipate by Labor Day, it will really be shaping up.. if it not already is. It's really starting to look like a nice busway.
I STILL have notes for you, but I think I've mentioned all the important stuff that the engineer(s) told me. And I'm sure more will come out as time goes on.
If you'd like to see the previous photo sets they can be found here by clicking on the links below:
Pics from 4/25/15
Pics from 6/20/15
Pics from 8/1/15
Pics from 9/19/15
Pics from 10/31/15
Pics from 1/9/16
Pics from 3/12/16
Pics from 4/16/16
Pics from 5/15/16
Pics from 6/26/16
Pics from 8/13/16
Pics from 10/5/16
Pics from 11/10/16
Pics from 12/14/16
Pics from 2/2/17
Pics from 3/23/17
Pics from 4/20/17
Pics from 6/3/17
And if you'd like to see the ALL of NEW photos, you can click
here
Now for the highlights..
Here's some signal work being done on Central Ave @ Eastern Ave. This is apart of the project to modernize the lighting system there, along with better pedistrian crossing, and most likely, signal priortiziation for the buses (Massport and SL) thru that intersection
----
A look at Eastern Ave Station from Eastern Ave. Notice the new greenery and plants, looks like they are now just laying out the sidewalk and platforms. It's almost done!!
----
A look at the new shared use path near Eastern Ave Station, as seen from Eastern Ave. Looks like fence posts are going in..
----
Here's the finished concrete pads at Cottage Street. As I said in previous posts, anywhere where a bus could dwell for more than a couple of seconds, a cement pad was put in to prevent sagging.
----
I took this picture for you guys. This is to show how much higher the concrete pad than the rest of the grade is. I am willing to bet this crossing will be raised.
----
Here's looking toward the Bellingham Street bridge and the new (covered) concrete slab
----
A shot of the height difference from the otherside of the street (toward the Bellingham Street Bridge)
----
A look back at Eastern Ave Station from the Bellingham Street Bridge
----
A view looking toward Box District Station from the Bellingham Street Bridge
----
A look back at the Bellingham Street Bridge from Library Street
----
Box District Station with its finished cement pads
----
Another look at Box District Station
----
A final look at Box District Station
----
The shared use path (and now covered Eversource Box) as seen from the Broadway Bridge
----
A look back at Box Distrct Station from the Broadway Bridge
----
A look at the Broadway Bridge as seen from the Washington Ave Bridge
----
Bellingham Square Station as seen from Arlington at Sixth
----
Everett Ave Crossing. Not 100% sure what they are doing here and why Everett Ave is one lane, but I'm sure in a few weeks we will find out. They are putting in cement pads at Chelsea Station (and probably the entrance to the busway next to MGH Chelsea) also. So it may have something to do with it. Everett Ave may just be the first finished crossing since it's a busy roadway.
----
Chelsea Station as seen from Everett Ave. Looks like its getting ready for concerete
----
A look at Chelsea Station from the backside of the bus loop.
---
A look at the entrance to Market Basket's parking lot from the bus loop. Looks like Buses will be able to enter/exit without doing hard turns onto city streets.
----
That's all for now. Next set will probably be after labor day.. hopefully lots of project by then. I also think I may ask for another official tour mid-fall. By then, lots of progress should be done.
And as always, let me know what you think!