What about the the proposed third tower at State Street HQ | One Congress | Bulfinch Crossing.
Is that still happening?
That's only ~350'. I assume the user is referring more to buildings in the 500'-600'+ range. There's the North Station proposal that's right around 500' but even the most optimistic timeline would still be a few years away. Otherwise it's kind of a reset as we're out of proposed/approved buildings in that range.
1 Bromfield could have gone over 700' as a residential, is currently proposed as a ~400' office, and probably won't be built.
Copley Place Tower could have been a 625' residential but looks like it's never going to happen, and key approvals have expired.
Aquarium garage could host around 600' but for some reason everybody hates Chiofaro.
Certain Back Bay parcels (Air rights near Mass Ave) could eclipse 500' easily but don't have concrete proposals (remember the one for the tall residential that ended in a lawsuit?).
Back Bay Garage could maybe come back higher, but the vision doesn't seem to be there.
There's that potential Kenmore building with FAA heights around 570' but no official proposal has shown up.
We still have multiple 400'+ for Kendall, but those will be lucky to make the metros Top 30 tallest buildings (MXD Residential will be 31st).
Considering we just built 5 of our 8 tallest buildings since 2016, it's a clear "end point" of that scale when we don't even have a Top 25 building on the horizon. Once South Station Tower is done, the latest iteration of the skyline will be locked into place for a long time. Tough to complain, but disappointing that the gravy train has run out of steam.