ITA with the "disappointing" aspect of the "Pavillion" (rhymes with "Papillon"?); it reminds me of the field house (which I believe has since been renovated to replace the front wall with windows) at RPI:
In addition, the rough sketch of the seating layout doesn't tell me much about the ADA access; are wheelchairs banished to the back row or the expensive courtside seats? I'd love to see them go higher, perhaps bringing back the convention center idea with breakout rooms on a lower level and an arena space more in line with what's been done with the Cross Center.
The garage, OTOH, doesn't bother me; I don't mind parking garages and don't see why they should have to pretend they're something else. It actually looks more "done up" than the arena, the theoretical centerpiece of the project, does!
One thing I liked is that in the "Plans" document, they gave a step-by-step rendering of the buildout in each of the phases, showing the evolution of the buildings as well as things like surface parking. They're also still planning for a boat dock at the foot of the Point, which I like because there's a decent depth there, even at low tide, and I'd like to see them pursue something like a Duck Boat water taxi to the waterfront.
EDIT: In looking through the submitted materials, I found the currently-proposed development schedule as presented at the Neighborhood Meeting in December: (Phases from the site plan maps, Phases 1G, 2B and 2C were not mentioned in the meeting minutes that are in the packet.)
"Brick North" (existing Building A, Phase 1A) - "being renovated as a mixed-use building." Projected finish date: Summer 2014. (Phase 1A also includes the improved Thompson's Point Road access to the site.)
"The Depot" - Building B1, Phase 1B, the former train shed pictured in Corey's post above - "to be renovated to become an open-sided structure.... It will be the support building for the outdoor concert area that can accommodate approximately 4800 and will hold summer concerts and other performances." Projected finish date: Summer 2014
"Circus Conservatory" (Building C, phase 1C, aka Brick South, the big one that already has the Circus signage painted on) - "Most of the building will be renovated with 7,000 square feet of the original structure to be adaptively reused." Projected finish date: Fall 2015. It looks more like "all but 7,000 square feet will be torn down and replaced" to me from the renderings.
Suburban Propane relocation to Riverside St.: Projected start date: Fall 2014. This is a prereq to the parking garage and arena buildout.
Sports medicine building (Building D, Phase 1D): anticipated start date Summer 2014. This phase also includes Building B2, a small building adjoining The Depot.
"125-room Hotel and Restaurant" (Buildings E1 and E2 respectively, Phase 1E): "Restaurant will be 6,000 sq. ft. with indoor seating an a seasonal outdoor patio, potentially with upper floors consisting of office space." Projected start date: Fall 2015. The hotel will be the first building to stretch to the new 120 foot height limit.
Two levels of residential condos will also be built atop the hotel.
Parking Garage (Buildings F1 and F2, Phase 1F), appx. 730 spaces, Projected finish date Fall 2017
(Phase 1G is Building G, a 9-story office building to be just to the northwest of the hotel, no date info available.)
Event Center (Building H, Phase 1H): Projected finish date Fall 2017
Cultural Center (Building I, Phase 2A), anticipated start date fall 2015.
(Phase 2B: Buildings J1 and J2, the office/residential towers to the northwest of Building G, no date given.)
(Phase 2C: Building B3, a mixed use or possibly restaurant alongside B2, no date given.)