That’s officially the ugliest new building in all of Boston.
https://flic.kr/p/2gKjipH
https://flic.kr/p/2gKk4vE
https://flic.kr/p/2gKk8qo
IMG_9286 by Bos Beeline, on Flickr
IMG_9287 by Bos Beeline, on Flickr
IMG_9289 by Bos Beeline, on Flickr
IMG_9288 by Bos Beeline, on Flickr
IMG_9295 by Bos Beeline, on Flickr
IMG_9296 by Bos Beeline, on Flickr
IMG_9297 by Bos Beeline, on Flickr
IMG_9299 by Bos Beeline, on Flickr
IMG_9300 by Bos Beeline, on Flickr
IMG_9304 by Bos Beeline, on FlickrIs this an example of what you guys refer to "5+1 construction"?
wow, surface parking for 430 cars with a ferry to Cambridge crossing? Keeping that site a surface lot for the next 13 years, trying to get that much extra cars back on 93 between 3.30 and 6.30. This all seems daft.Directly next to Hood Park, in between it and the Sullivan Station, the bus storage/maintenance yard is being bulldozed. It's a prime development space... being turned into a remote parking lot for Cambridge Crossing?
"The letter of intent with Sanofi to lease the space for 10 years to create satellite parking at the Sullivan Square location that would be operational Monday through Friday only. It would start on Sepember 2020. The 431 cars would park at the lot, and then six to 10, 24-person, shuttles would ferret the Sanofi workers to Cambridge Crossing."