MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

Does anyone know why the Green Line goes so slow between Reservoir and Beaconsfield? What needs to be done to speed up this stretch?
Some combination of going over switches and through a yard area, if I remember correctly. The Type 10s should help with the former, the latter is safety and/or regulatory related and probably isn't changing anytime soon.
 
On that stretch yes, but North Quincy to Braintree and back looks like speeds have increased all day so far - looks like it saves about a minute in each direction (as far as we can tell with half a day of info).
IMG_1052.jpeg
 

Back
Top