Search results

  1. J

    MBTA Buses & Infrastructure

    They could do that easily with the Washington Street Silver Line, but I think the more important connection is North Station to Seaport and Airport, and those buses are already underground. As a reminder, Sl Phase 3 was underground to Boylston. Im proposing underground to North Station via the...
  2. J

    MBTA Buses & Infrastructure

    Considering its clear the future of the MBTA is an entirely Silver Line based transit network, I think its time to start thinking about the South Station-North Station connection to be done via the Silver Line. The Silver line is already underground at South Station. Just knock a hole into the...
  3. J

    Transit history/trivia quiz

    Outside of the Boston Elevated Railway (BERy) system, where were the last streetcars operated in the state? Well, Lowell is still running sort of....
  4. J

    I-90 Interchange Improvement Project & West Station | Allston

    An ideal plan would have a train running from Riverside to North Station, stopping along the way.
  5. J

    Transitmatters/Sierra Club bus electrification report

    I will read the report later, but if it doesnt start by recommending SL2 have wire strung up immediately, the whole thing is trash
  6. J

    The New Retail Thread

    Damn, thats a long run. If my memory is correct, they opened in 2008. Was a Brazilian place before that
  7. J

    Fenway Center (One Kenmore) | Turnpike Parcel 7, Beacon Street | Fenway

    Thats nice 3rd track theyre building there. Surely thats what it is, because no one would be dumb enough to permanently make the route 2 tracks
  8. J

    Green Line Extension to Medford & Union Sq

    Is there a major company along the new extension they could sell free-fare naming rights too? 'FREE FARES BROUGHT TO YOU BY X COMPANY" *They pay 1 million, fares would have been 10 million, but thats ok no need to discuss.
  9. J

    MBTA Buses & Infrastructure

    Its baffling that people have been talking about the north-south rail link for years but theres never been a "temporary" bus connection meanwhile. The 4 (I think its the 4) doesnt count.
  10. J

    MBTA Buses & Infrastructure

    https://mass.streetsblog.org/2021/09/22/a-first-look-at-the-ts-proposed-high-frequency-bus-network/
  11. J

    Green Line Extension to Medford & Union Sq

    Agreed. They could even brand it as a one-year introductory free period to build ridership.
  12. J

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Right, directly under the sign that says "north" the map shows the line going north in the outbound direction. Its poor map design.
  13. J

    Green Line Extension to Medford & Union Sq

    They could switch sides and run on the left in both directions until they switch at North station or whatever
  14. J

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    "Park Street and North" - I prefer "eastbound". The way they draw the map makes it seem like the green line is going north to the west as well
  15. J

    Green Line Extension to Medford & Union Sq

    We had all door boarding with Charlie Card 1.0 and some imbecile at the MBTA decided it was better to squeeze out every last penny and add 5 minutes of travel time to the green line because heavens forbid someone not pay
  16. J

    Logan Airport Flights and Airlines Discussion

    Spirit is doing Boston-EWR again apparently. My friend was on it this past weekend
  17. J

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    You can tell theyre modern because the "tap to pay" area is enormous
  18. J

    I-90 Interchange Improvement Project & West Station | Allston

    The solution is obvious folks. Elevate the river instead and put the cars under it
  19. J

    MBTA Construction Projects

    Lot of great updates
  20. J

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Do buses have a system in place?

Back
Top