Equilibria
Senior Member
- Joined
- May 6, 2007
- Messages
- 6,959
- Reaction score
- 8,036
BCDC yesterday:
www.bostonplans.org/documents/plann...ns/allston-yards-bcdc-presentation-2019-04-02
Interesting thing in here - on p.17 we get the first render of the three north side buildings, with a Bose sign visible. Back in 2017 Bose signed for office space at Boston Landing, not here, which makes me wonder if they're shifting even more in from Framingham...
Big difference also between the pre-VE north side buildings and the post-VE Building A, which makes me cynical that they actually plan to build anything like what they've drawn here.
www.bostonplans.org/documents/plann...ns/allston-yards-bcdc-presentation-2019-04-02
Interesting thing in here - on p.17 we get the first render of the three north side buildings, with a Bose sign visible. Back in 2017 Bose signed for office space at Boston Landing, not here, which makes me wonder if they're shifting even more in from Framingham...
Big difference also between the pre-VE north side buildings and the post-VE Building A, which makes me cynical that they actually plan to build anything like what they've drawn here.