Assembly Square Infill and Small Developments | Somerville

0EE2FF3C-B3C9-4E34-84B2-70259D7D3EB2.jpeg
2A03F91E-2A14-446E-84DC-79BEF75733C7.jpeg
 
IMG_9933 by Bos Beeline, on Flickr

IMG_9935 by Bos Beeline, on Flickr

IMG_9934 by Bos Beeline, on Flickr

IMG_9941 by Bos Beeline, on Flickr

IMG_9943 by Bos Beeline, on Flickr

IMG_9944 by Bos Beeline, on Flickr

IMG_9950 by Bos Beeline, on Flickr

IMG_9954 by Bos Beeline, on Flickr

IMG_9960 by Bos Beeline, on Flickr

IMG_9971 by Bos Beeline, on Flickr

IMG_9966 by Bos Beeline, on Flickr

IMG_9984 by Bos Beeline, on Flickr

IMG_9990 by Bos Beeline, on Flickr

IMG_9989 by Bos Beeline, on Flickr

IMG_9979 by Bos Beeline, on Flickr

IMG_0008 by Bos Beeline, on Flickr

IMG_0010 by Bos Beeline, on Flickr
 
Last edited:
What is the work sit east of the CR bridge along the south shore of the Mystic? Is it an expansion of the MBTA facilities or Harbor Walk?

IMG_9991 by Bos Beeline, on Flickr
 
What is the work sit east of the CR bridge along the south shore of the Mystic? Is it an expansion of the MBTA facilities or Harbor Walk?

IMG_9991 by Bos Beeline, on Flickr

They've been rebuilding the "seawall" along the MBTA Charlestown facilities for a bit of time, but looks like it's more visible from Assembly now. The work is primarily all "critical" infrastructure work, as the old shore (much less a "seawall") was caving in, and emergency federal funding was secured, but they've worked with DCR to get a bike bath put on top once it's completed. Not sure how much of a bike path it will be...
 
What is the work sit east of the CR bridge along the south shore of the Mystic? Is it an expansion of the MBTA facilities or Harbor Walk?

While this thread has your attention, can you add the space next to the vertical slash in the title? ;)
 

Back
Top