I posted
a list of upcoming bike infrastructure projects early in 2016, and updated it a couple times over the year. We've now passed most of the traditional end of construction season markers, so time to take stock.
Here's a list of what opened this year, what seems like it still might open, big projects that started construction this year, and projects that seem to have been delayed or canceled. I'll pull together the suburban projects for the other bike thread but didn't track those very closely. Let me know what I missed!
New or improved infrastructure that opened in 2016
• Bike path and two-way bike lane to nowhere on Harvard's South Campus drive (
Or did this open in 2015? Will be extended as Harvard develops their Allston properties.)
• Mostly repaved Boston-side Paul Dudley White bike path from Allston through to the Longfellow, a new boardwalk under the BU Bridge, and some work at the Arsenal Street bridge
• Final segment of the East Boston Greenway path from Wood Island to Constitution Beach (
Opened on 5/26, with a big Hubway expansion into Eastie a few months later)
• Greenough Boulevard path and bike lanes (
Opened in June but was largely complete at the start of the year.)
• First block of the Grand Junction path through Kendall Square (
Opened on 6/9)
• New Memorial Drive path from the BU boathouse to the Longfellow Bridge (
More or less finished in October, likely some landscaping work in 2017)
• Union Square improvements: Medford/Somerville intersection rebuilt, Washington Street underpass rebuilt, buffered bike lane added to Somerville Ave, priority lanes and bike lanes added to McGrath frontage roads.
• Beacon Street (Brookline) double buffered bike lane (
It was supposed to be a 6-month summer pilot, but delayed by MassDOT and wasn't striped until 11/14.)
• Staniford Street Connect Historic Boston cycle track (
Opened late on 11/18, rest of Connect Historic Boston is also delayed)
• Vision Zero Mass Ave improvements in Boston (
Sriping finished and some flex posts installed by mid-November, more work planned in 2017.)
• Misc. Boston projects: Old Colony buffered bike lanes (DCR), separated bike lane on Beacon from Mass to Charlesgate, new posts on existing Congress Street bike lane, bike lane on Washington Street by Ennerking, bike lanes on Cambridge Street past City Hall
• Misc. Cambridge projects: Cambridgepark separated bike lane, Inman green paint and left turn ban, Several West Cambridge bike lanes and priority lanes, separated Kendall contraflow, two-way path on Fulkerson, Alewife path repair (MBTA), New Street bike lanes+intersection improvement
• Misc. Somerville projects: Neighborways through Spring Hill, Highland bike lane and box in Davis, Summer Street climbing lane swap, partially complete Beacon Street separated bike lane
Infrastructure that seems like it still has a chance to open in 2016
• Demonstration separated bike lanes in Cambridge (
About a block of separated bike lane each in Central and Harvard Squares, installation in December.)
• Signalized Route 9 Crossing of the Emerald Necklace + new Emerald Necklace paths (
Paths and signals are installed, but signals aren't active as of late October)
• Codman Square and Norfolk Avenue Vision Zero traffic calming and bike lanes (
Some streets striped, traffic calming work MIA?)
Projects that were supposed to open this year, but were delayed
• Downtown Connect Historic Boston cycle tracks (
Staniford street segment open, but work still underway on Causeway and Commercial. Was first billed as opening in summer 2016)
• Interim improvements at the PDW path crossing of River Street and a sidepath to Cambridge Street buffered bike lane (
Work was underway towards a summer 2016 completion date, but ran into drainage problems and work was undone.)
• Arborway/Forest Hills cycle tracks and link to Southwest Corridor (
Entire project is a year behind schedule due to T station delays, paths won't be usable until 2017. Initial date was 9/30/16)
• Constitution Road cycle track (
Part of Connect Historic Boston with a summer 2016 opening date, but start delayed to 2017. A two-way bike lane that will connect to this was striped through the Navy Yard.)
• Neponset River Greenway multiuse path from Mattapan to Milton (
Delayed from summer 2016 opening to spring 2017 opening.)
Big construction projects that began work this year, but won't open until later:
• Beacon Street (Somerville) separated bike lanes (
Southbound separated bike lane now open in an incomplete form, project should be fully open by the end of 2017 with some work through 2018.)
• Cedar Street (Somerville) buffered bike lane (
Part of a big water project, work underway Summer 2016-Summer 2017)
• New Charles Circle to Esplanade bike/ped bridge (
Under construction now, lots of concrete already poured. Old bridge will stay open until new bridge is finished.)
• Commonwealth Avenue separated bike lanes (
Delayed start. Ceremonial groundbreaking on 10/28/16 for a 2019 opening)
• Audubon Circle project (
Beacon and Park intersection being rebuilt, will include bike lanes on all approaches. 2017 opening?)
• Huron Avenue buffered bike lanes (
Part of a big water project with paving on 12/6. Cambridge city council pushed to make this separated but city staff don't want to change it. 2017 opening)
Ongoing projects that started construction before 2016, are still under construction, but aren't opening until 2017 or later:
• Conley Terminal Path along First Street (
Path looks complete but lots of work is left on the rest of the project that will probably keep it closed. Fall 2017 opening.)
• Binney Street separated bike lanes (
Westbound is complete and open, eastbound lane is complete but serving as a temporary sidewalk until building construction is finished.)
• Central Square (East Boston) (
Square and approaches all being rebuilt, will include bike lanes.)
Planning and advocacy efforts that wrapped up
• State legislative push (All bills failed this session.)
• Keeping the Western Avenue in Boston protected bike lanes open (Parking protection was removed, but cones were added instead.)
• Keeping the D Street bike lanes in the Seaport from being removed by Indycar (Indycar cancelled so lane wasn't modified.)
• Reactive Cambridge bicycle safety improvements (City council agreed to several improvements and demonstrations)
• Keeping the Somerville Community Path extension in the GLX plan (Path survived GLX redesign process in diminished state.)
• Keeping separated bike lanes in the new North Washington Bridge plan