bigpicture7
Senior Member
- Joined
- May 5, 2016
- Messages
- 3,746
- Reaction score
- 8,606
Why not erect an adjacent temporary span like they did during this project:
Here are some neat in-process photos of the temporary span construction.
Here are some neat in-process photos of the temporary span construction.
Installation of a temporary river span will allow repairs to landmark Tyngsboro Bridge.
Work crews installed a 650-foot temporary bridge across the Merrimack River as part of a Massachusetts Highway Department (MHD) effort to repair the Tyngsboro Bridge, a 70-year-old landmark near the New Hampshire border.
Atlantic Bridge & Engineering Inc., Salisbury, Mass., assembled a Mabey Panel Bridge on the east side of the [site]. The bridge will rest on a temporary abutment and four piers built by the $4.75-million project's general contractor, SPS New England, also of Salisbury.
Last edited: