Boynton Gateway | 495 Columbia Street | Somerville

Look at this crazy clay soil.

01DAD756-4298-414E-8D5A-BB74677DB114.jpeg
B9CC3242-CC42-4333-A9B1-C79080099A83.jpeg
8F9D956C-C092-46FB-8D67-7B361AD01389.jpeg
 
Wow, a second crane going in. How fast do they need this building to go up?? The floor slab looks to be about 6' thick. Definitely engineered to be stable on clay soil.

IMG_8659.JPG

IMG_8656.JPG
IMG_8845.JPG
 
Last edited:
The second crane is probably required due to boom loading and swing considerations on that L-shaped footprint.
 

Back
Top