BU Data Sciences Center | 665 Commonwealth Avenue | BU Central

The missing fins are indeed missing and are not a design move. They will be filled in.

What about the top corner where 1/3 of it is totally clear glass? Is that also supposed to be filled in?
 
What about the top corner where 1/3 of it is totally clear glass? Is that also supposed to be filled in?
It should remain glass. You can tell by the lack of stand-off tabs where the fins would attach (can see them in the smaller patches waiting to be filled).
 
070159BE-C320-4792-BEE7-E46C11921324.jpeg

DD293D02-1D1B-4700-BA8A-B043D81DC4AF.jpeg
 
So... they're just gonna leave that roof an unfinished mess with everything exposed and sloppy?
 
The render you posted doesn't show what they plan on doing with the exposed concrete top.
it doesn't? sure looks like a mechanical screen/top "level" that isn't currently there to me -- either in pix or in person (i just walked by it today). but, sure.
 