I'm pretty sure this is topped out in terms of floors and core. Appears to be 32 floors above the mechanical level. And the schematics in the PNF showed 32 floors above mech plus about two additional core stories.
So they only thing we are waiting on now is glass to catch up.
The schematics in the PNF were also for the 691' version, which was later raised to 699' plus mech. If you look there also appear to be more floors in that diagram (figure 2-13) below the first mech than in the finished product. In fact, you can see it even better if you rotate figure 2-14. There's 23 floors below the mech there, vs 20 in real life. It seems clear that there was a revision and it's not posted on the BRA's site.
I have counted the windows in some of the higher resolution renders and come up with 59. It's currently finishing forming floor 53. I expect the floors to fully catch up to the core (with the core possibly having 1 more floor to go), and then there should be a steel crown on top of ~2 stories to hide the mech.
We'll see who's right soon enough.
Last edited: